MARCH KEY FIGURES
| | Mar Qtr 13 | Dec Qtr 12 to Mar Qtr 13 | Mar Qtr 12 to Mar Qtr 13 |
| | $m | % change | % change |
|
Trend estimates(a) | | | |
| Total new capital expenditure | 39 083 | -2.7 | -2.0 |
| Buildings and structures | 24 424 | -3.0 | -2.7 |
| Equipment, plant and machinery | 14 702 | -1.9 | -0.7 |
Seasonally adjusted(a) | | | |
| Total new capital expenditure | 38 510 | -4.7 | -4.4 |
| Buildings and structures | 24 028 | -5.5 | -6.0 |
| Equipment, plant and machinery | 14 482 | -3.3 | -1.6 |
|
(a) In volume terms |
New Capital Expenditure, in Volume terms
| |
MARCH KEY POINTS
ACTUAL EXPENDITURE (VOLUME TERMS)
- The trend volume estimate for total new capital expenditure fell 2.7% in the March quarter 2013 while the seasonally adjusted estimate fell 4.7%.
- The trend volume estimate for buildings and structures fell 3.0% in the March quarter 2013 while the seasonally adjusted estimate fell 5.5%.
- The trend volume estimate for equipment, plant and machinery fell 1.9% in the March quarter 2013 while the seasonally adjusted estimate fell 3.3%.
EXPECTED EXPENDITURE (CURRENT PRICE TERMS)
- This issue includes the sixth estimate (Estimate 6) for 2012-13 and the second estimate (Estimate 2) for 2013-14.
- Estimate 6 for 2012-13 is $163,018m. This is 2.6% higher than Estimate 6 for 2011-12. Estimate 6 is 2.0% lower than Estimate 5 for 2012-13.
- Estimate 2 for 2013-14 is $156,467m. This is 9.8% lower than Estimate 2 for 2012-13. Estimate 2 is 3.4% higher then Estimate 1 for 2013-14.
- See pages 7 to 10 for further commentary on expectations data.
NOTES
FORTHCOMING ISSUES
ISSUE (QUARTER) | Release Date |
June 2013 | 29 August 2013 |
September 2013 | 28 November 2013 |
December 2013 | 27 February 2014 |
March 2014 | 29 May 2014 |
REVISIONS
- The December quarter 2012 estimate for total Mining capital expenditure has been revised downwards $550m (-2.1%) in current price, original terms. The revision was due to updated information received from survey respondents. Within the total revision, equipment, plant and machinery has been revised downwards $402m (-8.4%) and buildings and structures has been revised downwards $148m (-0.7%). Revisions to seasonally adjusted estimates are due to revisions to original estimates as well as concurrent methodology for deriving seasonal factors.
INQUIRIES
For further information about these and related statistics, contact the National Information and Referral Service on 1300 135 070 or Liz Bolzan on Sydney (02) 9268 4508.